Brief Update

No photos from today, but we got all the drain/waste/vent pipe finished, and connected the PEX manifolds to the hot and cold water.

Tomorrow we're going to finish the water supply and pressurize it for the inspection, fill up the DWV system with water (another test for inspection), and get the two bathroom fans ducted to the outside.

posted by ayse on 12/06/14

1 Comments

It must be getting exciting -- with most of the rough-ins in, you will be ready to close walls and start installing all the "bling" for the bathrooms like shower, toilets, sinks, and flooring. Cannot wait to see the end product!